Filters
Sort By:
Filters
Sub category
Sort By:
Sort Name

Manual for the 225D SmartCell indicator homerun cable installation instructions, setup and configuration, and scale diagnostics.

Spanish language manual for the 225D SmartCell indicator homerun cable installation instructions, setup and configuration, and scale diagnostics.

825D Installation and Technical manual with cable installation instructions, setup and configuration, and scale diagnostics.

Instructions for manually adding a new scale site on the iSite cloud-based remote monitoring website.

Spanish instructions for manually adding a new scale site on the iSite cloud-based remote monitoring website.

Informative flyer announcing an additional lifting bracket on ARMOR steel deck bridges made after January 1, 2020.

Technical bulletin explaining the 18AWG homerun cable and proper grounding requirements for the ARMOR digital truck scale.

Installation instructions, configuration, calibration, and parts identification for ARMOR Digital Truck Scales.

A list of some of the top system problems with recommended solutions to those problems for ARMOR Digital Truck Scales

Maximum Homerun cable length chart. Note that length is determined by number of digital load cells in the scale.

1